New portion of Barka-Nakhal road opens for traffic
Published: 01:12 PM,Dec 24,2019 | EDITED : 04:05 AM,May 04,2024
Muscat: The Ministry of Transport on Tuesday opened a new part of the dual Barka-Nakhal Dual-Carriageway project, with a length of 8 km that starts from the village of Habra in the Wilayat of Wadi Al Maawil and ends before Nakhal roundabout.
The opening of this part is a continuation for the previously opened part with a length of (14) km, bringing the total parts opened for the traffic to (22 km). --ONA
[gallery ids='593961']